Skip to content

Cafeteria Renovations complete

New display and distribution cases installed in the lunch room as part of the renovation of the cafeteria.

Check out photos of the completed renovations to MS 915’s lunchroom which includes upgraded seating and meal distribution areas.

  • Students sit at a new round table in the lunch room installed as part of the renovation of the cafeteria.
    Students sit at a new round table in the lunch room installed as part of the renovation of the cafeteria